QA/QC Manager x2 (Data Centre/Construction/M&E/MNC)
Talent Trader Group · Johor Bahru, Johor, Malaysia
Checked against workable. Still accepting applications.
- Location
- Johor Bahru, Johor, Malaysia
- Type
- Full-time
- Posted
Key Responsibilities:
- Develop and implement QA/QC plans, procedures, and inspection test plans (ITP) for all construction and M&E works in data centre projects.
- Oversee quality inspections, audits, and testing activities across all project phases, including civil, structural, M&E installations, and commissioning.
- Conduct root cause analysis (RCA) and corrective actions for quality issues, ensuring continuous improvement.
- Monitor and enforce quality standards for electrical, mechanical, HVAC (ACMV), fire suppression, and security systems.
- Coordinate with stakeholders (contractors, consultants, suppliers) to resolve quality concerns and ensure compliance.
- Ensure documentation and traceability of test results, material inspections, and handover records.
- Train project teams on quality processes, safety protocols, and best practices to uphold high standards.
Requirements
- Bachelor’s degree in Engineering (Mechanical, Electrical, Civil) or a related field.
- At least 8 years of experience in QA/QC
- Strong knowledge of data centre infrastructure, including M&E systems, redundancy, power distribution, and HVAC cooling systems.
- Experience with QA/QC tools and methodologies, including ISO 9001, Six Sigma, and Lean Quality Management.
- Proficiency in QA/QC reporting, NCR (Non-Conformance Reports), and Root Cause Analysis (RCA).
- Strong leadership, problem-solving, and stakeholder management skills
Interested candidates who wish to apply for the advertised position, please click 'APPLY' to submit your application or send in your resume to engg1@talenttradersg.com
EA License No: 13C6305
Reg. No.: R1874608
For candidate who applied for the advertised position is deemed to have consented to us that we may collect, use or disclose your personal information for purpose in connection with the services provided by us.
Stop retyping the same form
Upload a resume once, and Otto fills in this application for you.
Get started →